Madge Metal was responsible for the fabrication and installation of more than 80 tonnes of structural steel and purlins for a new single-storey TAS building. Working with industry leader and well-respected builders Cash McInnes Projects, our install was completed to schedule enabling the continuity of trades for the builder.
By carefully co-ordinating the workshop fabrication team, industrial coating specialist and our very own on-site installation teams, we were able to ensure the continual flow of fabricated and coated steel for installation while adhering to strict project deadlines.
Madge Metal was responsible for the fabrication and installation of more than 80 tonnes of structural steel and purlins for a new single-storey TAS building. Working with industry leader and well-respected builders Cash McInnes Projects, our install was completed to schedule enabling the continuity of trades for the builder.
By carefully co-ordinating the workshop fabrication team, industrial coating specialist and our very own on-site installation teams, we were able to ensure the continual flow of fabricated and coated steel for installation while adhering to strict project deadlines.
Workshop drawings and 3D models
CNC plasma cutting
Workshop fabrication
Dulux 2 pack epoxy paint system
Co-ordinated site deliveries
On-site installation
Site clean and hand over
As built drawings and warranty documentation
Fabrication and installation of over 80 tonnes of structural steel and purlins for a new single story TAS building. Working with industry leader and well-respected builders Cash McInnes Projects, install was completed to schedule to enable the continuity of trades for the builder.
Co-ordinating between the workshop fabrication team, industrial coating specialist and our very own on-site installation teams we were able ensure that there was a continual flow of fabricated and coated steel for installation to ensure that strict project deadlines were adhered to.
project